Skip to main content
Tags: nasa | moon missions | megarocket boosters

NASA Awards Northrop Grumman Booster Production Contract for Moon Missions

NASA Awards Northrop Grumman Booster Production Contract for Moon Missions
A Northrop Grumman Antares rocket, carrying the Cygnus cargo spacecraft, launches from Pad-0A at NASA's Wallops Flight Facility on August 10, 2021 in Wallops Island, Virginia. (Kevin Dietsch/Getty)

By    |   Sunday, 05 December 2021 07:00 PM EST

NASA has awarded Northrop Grumman a $3.19 billion contract to build rocket boosters for Artemis moon missions through 2031, Space.com reported on Sunday.

The contract builds on a previous agreement in 2020 that authorized the company to prepare for production and build twin boosters for the next six Space Launch System (SLS) megarocket flights following Artemis 3.

SLS is scheduled to make its first flight next year without a crew, its first crewed orbital flight in 2024 and conduct the first landing mission the year after that.

"The contract allows NASA to work with Northrop Grumman to not only build the boosters for upcoming missions, but also to evolve and improve the boosters for future flights," Bruce Tiller, SLS booster manager at NASA's Marshall Space Flight Center in Alabama, said in the space agency's contract statement.

SLS boosters, which are designed for one-time use, are based on the solid rocket boosters used during 135 space shuttle missions between 1981 and 2011, according to Space.com

Northrop Grumman said in its statement regarding the new contract that the new boosters "will replace the steel cases used for the shuttle with a weight-saving composite case and upgraded structures, electronic thrust vector control systems and propellant materials to address obsolescence."

The company added that "this improved design additionally provides process simplification, improved interface, and streamlined ground processing at Kennedy Space Center, leading to greater productivity and efficiency."

Northrop Grumman says it has already completed booster production on Artemis 2, and that all segments for the Artemis 3 boosters have been cast with propellant. Artemis 4 segments began casting in November.

The company also has other NASA contracts in support of moon missions.

Brian Freeman

Brian Freeman, a Newsmax writer based in Israel, has more than three decades writing and editing about culture and politics for newspapers, online and television.

© 2025 Newsmax. All rights reserved.

Sign up for Newsmax’s Daily Newsletter

Receive breaking news and original analysis - sent right to your inbox.

(Optional for Local News)
Privacy: We never share your email address.

Newsfront
NASA has awarded Northrop Grumman a $3.19 billion contract to build rocket boosters for Artemis moon missions through 2031, Space.com reported on Sunday.
nasa, moon missions, megarocket boosters
278
2021-00-05
Sunday, 05 December 2021 07:00 PM
Newsmax Media, Inc.
Join the Newsmax Community
Read and Post Comments
Please review Community Guidelines before posting a comment.
 

Interest-Based Advertising | Do not sell or share my personal information

Newsmax, Moneynews, Newsmax Health, and Independent. American. are registered trademarks of Newsmax Media, Inc. Newsmax TV, and Newsmax World are trademarks of Newsmax Media, Inc.

NEWSMAX.COM
America's News Page
© 2025 Newsmax Media, Inc.
All Rights Reserved
Download the Newsmax App
NEWSMAX.COM
America's News Page
© 2025 Newsmax Media, Inc.
All Rights Reserved